Mini Piling, Hollowbar Micro Pile, Tralee, Co. Kerry

Mini Piling, Hollowbar Micro Pile, Tralee, Co. Kerry

TAL were involved in the installation of 24 piles as per the engineers instruction in a very restricted site. Due to the restricted nature of the works the TALMAN Drill Rig was again the right rig for the works.

Mini Piling, Hollowbar Micro Pile

Mini Piling, Hollowbar Micro Pile

Also we had to contend with Storm Ophelia who decided to grace her presents on us during the works. Working around oue operatives safety we still managed to be complete on time.

Two piles were dynamically tested of the working piles.

 

 

Mini Piling, Mallow, Cork

Mini Piling, Mallow, Cork

TAL were involved in the installation of hollowbar micro piles internally to house in order for the main contractor to install a raft slab due to subsidence issues with a domestic property.

Mini Piling

Mini Piling

TAL were also involved in void filling on this job.

Mini Piling

Mini Piling

TAL installed 30 number piles on site here and 3 piles were tested and passed here.

Mini Piling

Mini Piling

 

Mini Piling Works Frontstrand, Youghal, Cork

Mini Piling Works Frontstrand, Youghal, Cork

TAL were involved in the installation of 10 number 220mm bottom driven steel cased piles to 10m.

Mini Piling

Mini Piling

These piles were completed on time and within budget.

Mini Piling

Mini Piling

Two of the piles were dynamically tested by an independent company.

 

http://www.independent-testing.ie/

168mm ODEX Piles Ceanncora Lawn, Boreenmanna Road, Cork

168mm ODEX Piles Ceanncora Lawn, Boreenmanna Road, Cork

TAL were involved with the main contractor Carrigbel Construction in the installation of 14 number piles on site for this new build.

TAL Construction

TAL Construction

TAL installed 168mm ODEX piles including a rock socket at 14 number locations on site.

 

On completing the piles there were two piles dynamically tested to prove the loads.

ODEX Piles

ODEX Piles

Check Grouting & Anchors @ Summerstown Road, Wilton, Cork

Check Grouting & Anchors @ Summerstown Road, Wilton, Cork

TAL were involved in the installation of the engineers system here at 14 positions around the house.

Firstly there was a check grouting system used through the foundation at all positions to solidify the ground under the foundation to a depth of 1.5m

 

Anchors were then installed through these positions to a depth of circa 6m into good bearing ground.

Anchors

Anchors

 

 

 

Stabilization of Floor Slab, Longford

Stabilization of Floor Slab, Longford

TAL Construction were brought on board by Gem Construction to complete works during a shut down to rectify an area that one of the robots was on that had a rocking motion in the concrete floor.

 

Stabilization of Floor Slab

Stabilization of Floor Slab

TAL cored through the existing floor first. Then grouting was incorporated to solidify the upper section. Once this was completed a hollow bar was installed by hand through this down onto competent ground.

 

Escape of water claim, Woodbrook Avenue, Bishopstown, Cork

Escape of water claim, Woodbrook Avenue, Bishopstown, Cork

Escape of water claim - Pressure Grouting

Escape of water claim – Pressure Grouting

TAL Construction were involved in the claim for the above property in relation to works to be completed to the foundation.

TAL completed pressure grouting to the affected foundations.

TAL replaced the clay drains with PVC drains.

Escape of water claim - Drainage Replacement

Escape of water claim – Drainage Replacement

TAL replaced the pavements.

Escape of water claim - Driveway Prep

Escape of water claim – Driveway Prep

Escape of water claim - Tarmac

Escape of water claim – Tarmac

Hollowbar Piles, Renmore Road, Co. Galway

Hollowbar Piles, Renmore Road, Co. Galway

TAL Construction were involved in the installation of hollowbar piles for an extension at this property.

Hollowbar Piles

Hollowbar Piles

TAL installed 8 number Hollowbar piles to 8m. Dynamic load testing was completed on the site on two of the working piles as well.

 

 

Subsidence Works, Hamilton Street, South Circular Road, Dublin 8

Subsidence Works, Hamilton Street, South Circular Road, Dublin 8

TAL were involved in the installation of compression and compression piles along with beams to stabilize the front elevation of the property.

Subsidence works - Grundomat

Subsidence works – Grundomat

Due to the extremely restricted access of the property TAL used a grundomat pile installed inside and outside the front wall with a beam connecting them.

 

Subsidence Woks – Beam

2 Stage Grouting,Toilet Block, Monkstown, Cork

2 Stage Grouting,Toilet Block, Monkstown, Cork

TAL were involved with Ward & Burke Construction Ltd to propose a system here for works to the existing toilet block to rectify issues with the foundations.

2 stage grouting

2 stage grouting

The system incorporated here was a 2 stage grouting procedure.

Stage 1 involved drilling and grouting works to 1.5m deep.

Stage 2 involved drilling through stage 1 and continuing down to 3m.