Stabilization of Floor Slab, Longford
TAL Construction were brought on board by Gem Construction to complete works during a shut down to rectify an area that one of the robots was on that had a rocking motion in the concrete floor.
TAL cored through the existing floor first. Then grouting was incorporated to solidify the upper section. Once this was completed a hollow bar was installed by hand through this down onto competent ground.