Pressure Grouting Works Castelgreine Park, Cork
TAL were involved with the builder (repeat custom) on this refurbishment job to complete foundation remedial works.
TAL installed 6 number pressure grouting points by hand to 2m deep. This involved drilling to 2m deep at each posistion and then pressure grouting up the pins with neat cement grout. A H20 rebar was then installed.
Works were completed on time and within budget.