.Hollowbar Piles @ a Shop in Athlone
TAL were involved with the engineers to install a low vibration pile system inside in a shop that was still in operation during the day.
A Dynamic probes were completed inside in the location of one of the pads in order to determine what the ground would be like.
Hollowbar piles (R38-500 bars) were then installed into the two pad locations. The works had to be completed outside nornal hours so as not to in-peed in the daily running of the shop.
There were two pads here and there were 4 piles installed into each pad. Plates and nuts were installed for connecting the piles to the pads.