2 Stage Grouting,Toilet Block, Monkstown, Cork
TAL were involved with Ward & Burke Construction Ltd to propose a system here for works to the existing toilet block to rectify issues with the foundations.
The system incorporated here was a 2 stage grouting procedure.
Stage 1 involved drilling and grouting works to 1.5m deep.
Stage 2 involved drilling through stage 1 and continuing down to 3m.